Where we work in Morrisville The newest housing stock on our map
Morrisville has the newest housing stock of any town we serve. Nearly three out of four homes were built after 2000, and only about 3% predate 1980 (U.S. Census Bureau, ACS 2023 5-year, table B25034). That makes the Morrisville call a newer-home call: townhomes in Breckenridge and Kitts Creek with a 150-amp panel that is already full, a garage with no 240-volt outlet for the EV, builder lighting that was never enough, and home offices that need their own circuit.
EV chargers are the Morrisville job. It is a commuter town for RTP and the airport, and a lot of those commutes are electric now. Morrisville is Duke Energy Progress territory, so Duke’s EV Charger Prep Credit (up to $1,117) applies to most homeowners who add a Level 2 charger. In a townhome we check the panel and the HOA rules first, and that visit is free.
Electrical permits in Morrisville go through the Town of Morrisville Inspections Department on Town Hall Drive. We pull them and book the inspections for you, and the permit fee is its own line on your quote, so there are no surprises.